Skip to content
AFRME
The Two, a two-story kicked A-frame with a black standing-seam roof and larch gable, on a still northern lake shore under an overcast sky

The Modern A-Frame · 2027 build slots open

The Modern A-Frame.

One iconic shape in five sizes, designed and built by AFRME on your site. Reserve your 2027 build slot; nothing to pay today.

We build worldwide.

Our own crews travel to the site and work with a local partner builder where one is required. Tell us where you plan to build and we confirm the local requirements and timing before you commit to anything.

Why AFRME

We have done the hard part.

Designing a home from scratch is slow and expensive. We refined one design instead: an A-frame that kicks out at the knee, so the main floor has walls you can put a bed against and the widest room is upstairs, behind the balcony. Then we engineered it at five sizes, with one set of details, so every home starts from drawings that are already worked out.

Choose a size, tailor it with our team, and we build it on your site: AFRME is the builder on every home. Black standing-seam metal, a pale larch reveal and a gable of glass from floor to ridge come standard.

Close view of the knee of an AFRME roof where the black standing-seam metal folds inward against the pale larch reveal
Shell to home

Weather-tight in weeks. Then it becomes yours.

Drag to compare the same room as a shell and finished. Our crew raises the frames and closes the roof and the glass gable in weeks, and the finishes are yours to choose.

The same AFRME interior finished: larch-lined ceiling, glazed gable, sofa, dining table and a suspended fireplace
Interior of an AFRME A-frame during construction: exposed timber frame, sheathing and the glazed gable, tools on the floor
ShellFinished
A surf camp set back from the beach: Studio cabins among dune scrub and palms behind the sand, surfboards on a rack, grey ocean beyond
The Studio · Hospitality

The Compound.

Enter the fast-growing cabin-hotel and glamping market with a room guests photograph. Studios are built in series by our crew, sit on screw piles instead of concrete, and are weather-tight within weeks. Volume pricing from four units.

A custom The Two joined to a low flat-roofed annex in high desert scrub under an overcast sky
Custom

Beyond the five models.

Annexes, paired buildings, a sauna in the same profile, a lodge with twelve Studios and a Four on the hill. Custom projects keep the shape and change everything else, with the same engineering and the same crew.

Custom projects
Process

From the first call to your keys.

Seven steps, and the first is a free call. Feasibility in two to three weeks, a line-by-line estimate after design, a contract price before we break ground. First builds start in 2027.

  1. Step 1 · Today

    Discovery call

    Your site, your goals, your budget. We leave with what we need to check feasibility.

  2. Step 2 · 2 to 3 weeks

    Feasibility

    Zoning, access, ground, services and climate. You get notes and a whole-project cost schedule.

  3. Step 3 · 4 to 8 weeks

    Design

    Your model adapted to your site and your brief: layout, options, finishes. You leave with a line-by-line estimate.

  4. Step 4 · 8 to 12 weeks

    Engineering and permits

    Drawings and calculations for your site, stamped by a local engineer. The permit is filed with your town; we handle the revisions.

  5. Step 5 · 4 to 8 weeks

    Site and foundation

    Clearing, access, excavation and the foundation your ground needs: piles, strip or slab. Services brought to the house.

  6. Step 6 · 4 to 12 weeks

    Frame and shell

    Our crew raises the frames, closes the roof and the gable glazing, and hands over weather-tight.

  7. Step 7 · 10 to 16 weeks

    Fit-out and handover

    Services, insulation, kitchen, bathrooms and finishes, by our crew with local trades. Inspections, then keys.

Targets, not promises: the shell of a Studio in about a month, the One and the Two in two to three months, the Three and the Four longer. Fit-out depends on the finishes you choose.

Questions

Straight answers.

What people ask before they reserve: cost, who builds it, how long it takes, where we build. The full list covers permits, foundations, snow loads, financing and warranty.

All questions
What does reserving a build slot mean?

A reservation holds your place in the 2027 build schedule. It is free and does not commit you to anything. It gets you a discovery call, and pricing by model goes to reservation holders first. Nothing is paid until the drawings start.

How much does an AFRME cost?

Pricing by model goes to reservation holders first. The design and engineering are done once, so the structure costs less than a one-off. As a rule of thumb, the structure and shell are 35 to 45 percent of the finished cost; site, foundation and utilities 15 to 25; interior fit-out and finishes 20 to 30; design, engineering, permits and the local stamp 5 to 8; contingency 10. The feasibility cost schedule replaces these with real numbers for your site.

Who builds it?

AFRME does. Our own crew raises the frames, closes the shell and runs the fit-out with local trades, so the people who designed the house stay on it to handover. Where the state requires one, a licensed local partner builder works alongside us. One team, from the first call to the keys.

How long does the build take?

Seven steps. Discovery call, today. Feasibility, two to three weeks. Design, four to eight weeks. Engineering and permits, eight to twelve weeks. Site and foundation, four to eight weeks. Frame and shell, four to twelve weeks. Fit-out and handover, ten to sixteen weeks. Targets, not promises: the shell of a Studio in about a month, the One and the Two in two to three months, the Three and the Four longer. Fit-out depends on the finishes you choose.

Where do you build?

Worldwide. Our own crews travel to the site and work with a local partner builder where one is required. Tell us where you plan to build and feasibility confirms the local requirements and timing before you commit to anything.

Reserve a 2027 build slot.

Free, and not a commitment. A reservation holds your place in the 2027 schedule and gets you pricing and the full scope before anyone else.